Job details
The Fekola Gold Project produces in excess of 500,000 oz. of gold per annum from total annual open pit production of circa 95 million tonnes.
The existing operation is predominantly focused on a single large open pit but mining operations has expanded to include multiple satellite deposits. Continued exploration success means the number, size and schedule of open pit satellite deposits is dynamic and evolving.
The Chief Mine Geologist is responsible for all ore definition and grade control activities.
Location and Reporting Structure
Reporting to the Technical Services Manager, this position will be an 8/4 fly in-fly out rotation, based at the B2Gold Mali Fekola mine.
Responsibilities
There are no results matching your search.
Reset